CEE Faculty

Ossama (Sam) Salem Associate Professor, Director of Infrastructure Systems and Mgt Program, Coordinator of CEE/MBA ACCEND Program

Ph.D., PE, CPC , 1998                 University of Alberta, Canada       Civil & Environmental Engineering

 

Contact Information

E-mail : osalem@uc.edu
Office  : 795 Rhodes
Phone : (513)-556-3759
Fax     : (513)-556-2599


Areas of Interest

Infrastructure Systems and Asset Management, Construction Project Management, Lean Construction, Construction Safety and Health Issues, Risk Management and Life Cycle Assessment, Computer Applications and Simulation, Sustainability and C &D Waste Management, Trenchless Construction Methods, Equipment Management.

 

Publications

  • Salem, O. and Sameer, M., “Implementation Based Study of Construction Management IT Work Environments and Their Implications for Future Research Agendas”, American Society of Civil Engineers Journals, Journal of Construction Engineering and Management, Scheduled for Publication in 2008.

  • Salem, O., Shahin, A. , and Khalifa, Y., “Minimizing Cutting Wastes of Reinforcement Steel Bars Using Genetic Algorithms and Integer Programming Models”, American Society of Civil Engineers Journals, Journal of Construction Engineering and Management, Scheduled for Publication in 2008.

  • Dabke, S., Salem, O., Genaidy A, and Daraiseh, N., “Job Satisfaction of Women in Construction Trades”, American Society of Civil Engineers Journals, Journal of Construction Engineering and Management, Scheduled for Publication in 2008.

  • Salem, O., Miller, R., Deshpande, A., and Arurkar, T.*, "Accelerated Construction of Bridges: The Path Towards a Holistic Decision Making

  •  System", Transportation Research Board, Washington D.C., (86) 07-1681 (2007).

  • Salem, O., Miller, R., Basu, B*, and Deshpande, A., "Building Bridges Faster, Smarter and Better: Case Studies and Lessons Learned", Transportation Research Board, Washington D.C., (86) 07-2477 (2007).

  • Salem, O., Genaidy, A., Albers, J., Shell, R., and Sobeih, T., “Use and acceptability of reduced-weight Portland cement bags in masonry construction: an observational pilot study”, Wiley Periodicals, Human Factors and Ergonomics in Manufacturing Journal, 2007, In Press.

  • Genaidy, A., Salem, O., Karwowski, W., Paez, O., and Tuncel, S., “The work compatibility improvement   framework: An integrated perspective of the human-at-work system”, Journal of Ergonomics, 2007, In press.

  • Sobeih, T., Salem, O., Daraiseh, N., and Shell, R., “Psychosocial factors and musculoskeletal disorders in the construction industry: a systematic review”. Taylor and Francis Group, Theoretical Issues in Ergonomics Science, 7 (3) 329-344 (2006).

  • Hegab, M., Smith, G., and Salem, O., “Soil Penetration Modeling in Microtunneling Projects”, American Society of Civil Engineers Journals, ASCE’s Journal of Construction Engineering and Management, 132 (6) 598-605 (2006).

  • S. Tuncel, H. Lotlikar, O. Salem, and N. Daraiseh, “Effectiveness of behavior based safety interventions to reduce accidents and injuries in workplaces: Critical appraisal and meta-analysis”, Taylor and Francis Group, Journal of Theoretical Issues in Ergonomics Science, 7 (3) 191-210 (2006).

  • Salem, O., Basu, B., Miller, R., Randall, J., and Swanson, J., “Accelerating the Construction of a Highway Bridge in Ohio”, American Society of Civil Engineering Journals, Practice Periodical on Structural Design and Construction, 11 (2) 98-104 (2006).

  • Sun, L., Paez, O., Lee, D., Salem, O., and Daraiseh, N., “Estimating the Uninsured Costs of Work-Related Accidents: A Systematic Review”, Taylor and Francis Group, Theoretical Issues in Ergonomics Science, 7 (3) 227-246 (2006).

  • Salem, O., Paez, O., Genaidy, A., Seteney, T. *, and Shell, R., "Performance Tracking through the Work Compatibility Model", Wiley Periodicals, Human Factors and Ergonomics in Manufacturing Journal, 16 (2) 133-153 (2006).

  • Salem, O., Solomon, J., Genaidy, A., and Minkarrah, I, “Lean Construction:  From Theory To Implementation”, American Society of Civil Engineers Journals, Journal of Management in Engineering, 22 (4) 168-175 (2006).

  • Paez, O., Salem, O., Solomon, J., and Genaidy A., “Moving from Lean Manufacturing to Lean Construction: Toward a Common Sociotechnological Framework”, Wiley Periodicals, Human Factors and Ergonomics in Manufacturing Journal, 15 (2) 233-245 (2005).

  • Salem, O. and Zimmer, E., “Application of Lean Manufacturing Principles to Construction”, Technical Note, Lean Construction Institute, Lean Construction Journal, 2 (2) 71-78 (2005).

  • Basu, B., Miller, R., Salem, O., Randall, J., Swanson, J., and Engel, R., “Building a Precast Bridge in 19 Days”, Transportation Research Board, Washington D.C., (84) 05-0235 (2005).

  • Salem, O., Solomon, J., Genaidy, A., and Luegring, M., “Site Implementation and Assessment of Lean Construction Techniques”, Lean Construction Institute, Lean Construction Journal, 2 (2) 5-29 (2005).

  • Shahin, A. and Salem, O., “Using Genetic Algorithms in Solving the One-Dimensional Cutting Stock Problem in the Construction Industry”, National Research Council of Canada, Canadian Journal of Civil Engineering, 31 (2) 321-332 (2004).

  • Hegab, M. and Salem, O., “Productivity Analysis for Boulac’s Wastewater Microtunnels”, American Society of Civil Engineering Journals, Practice Periodical on Structural Design and Construction, 9 (2) 116-120 (2004).

  • Salem, O. and Haque, M. *, “Maintenance Equipment Fleet Management System: An Expert System Approach” Transportation Research Board, Washington D.C., (83) 04-4105 (2004).

  • Abdallah, S., Genaidy A., Salem O., Karwowski W., and Shell, R., “The Concept of Work Compatibility: An Integrated Design Criterion for Improving Workplace Human Performance in Manufacturing Systems”, Wiley Periodicals, Human Factors and Ergonomics in Manufacturing Journal, 14 (4) 379-402 (2004).

  • Salem, O., El-Assaly, A., and AbouRizk, S., “Performance Prediction Models of Pavement Highway Network in Alberta”, Transportation Research Board, Washington D.C., (82) 03-0739 (2003).

  • Salem, O., AbouRizk, S., and Ariaratnam, S., “Risk-Based Life Cycle Costing of Infrastructure Rehabilitation and Construction Alternatives”, American Society of Civil Engineers Journals, Journal of Infrastructure Systems, 9 (1) 6-15 (2003).

 

 Research Projects and Grants

    

  • Use of Trenchless Technologies for a Comprehensive Asset Management of Culverts and Drainage Structures -  Principal Investigator (PI), Federal Highway Administration /Midwest Regional University Transportation Center, Start Date: 06/07, Completion Date: 06/08.

  • Performance Improvement of Pavement Markings for Roadways - Principal Investigator (PI), TEC Engineering, Start Date: 09/06, Completion Date: 09/07.

  • Improved Models for Life Cycle and User Cost Analysis - Principal Investigator (PI), Ohio Department of Transportation (ODOT), Start Date: 09/05, Completion Date: 09/07

  • An Asset Management Approach for Culvert Infrastructures - Principal Investigator (PI), Federal Highway Administration/Michigan State University, Start Date: 12/05, Completion Date: 12/07

  • Nanomanufacturing Occupational and Environmental Health and Safety, Co- Principal Investigator (Co-PI), National Science Foundation, Start Date: 07/06, Completion Date: 01/07

  • Traffic Study to Treat Hazardous Locations in Riyadh – Co-Principal Investigator (Co-PI), TEC Engineering, Start Date: 01/06, Completion Date: 01/07.

  • Use and Acceptability of Reduced Weight Portland Cement Bags in Masonry Construction – Principal Investigator (PI), National Institute of Occupational Safety and Health (NIOSH), Start Date: 09/05, Completion Date: 09/06

  • An Occupational Epidemiology Study of Forklift Operators – Co- Principal Investigator (Co-PI), National Institute of Occupational Safety and Health (NIOSH), Start Date: 09/05, Completion Date: 09/06

  • Accelerated Construction Decision-Making Process for Bridges - Principal Investigator (PI), Federal Highway Administration /Midwest Regional University Transportation Center, Start Date: 10/04, Completion Date: 12/05

  • Best Modern Practices for Design in Fast Track Projects – Principal Investigator (PI), Construction Industry Institute (CII), Start Date: 12/04, Completion Date: 12/06

  • Implementation and Evaluation of Advanced Lean Construction Techniques - Principal Investigator (PI), Messer Construction, Start Date: 10/03, Completion Date: 10/04

  • Psychosocial Factors and Musculoskeletal Symptoms among Construction Workers – Principal Investigator (PI), National Institute of Occupational Safety and Health (NIOSH) Start Date: 08/03, Completion Date: 08/04